Close filters
  •  
from to
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
No results were found for the filter!
Enerpower 2S2P Li-Ion 7.2V-7.4V with Tamiya Connector
Enerpower 2S2P Li-Ion 7.2V-7.4V with Tamiya...
This Li-ion 2S2P battery with open ended cables has 7.2V-7.4V and is assembled with a protection circuit. This battery can be used universally, such as a spare battery for FUTABA transmitter. Technical specifications Min Capacity: 10000...
€38.99 *
Net price €32.76 VAT €6.23 *
Enerpower RC 2S1P Li-Ion 7.2V-7.4V 3,45Ah Open-End cables / JST-XH18
Enerpower RC 2S1P Li-Ion 7.2V-7.4V 3,45Ah...
This Li-ion 2S1P would be assembled without a protection circuit. An external JST-XH active Balancer connector has been implemented. Technical specifications Min Capacity: 3450 mAh Nominal voltage: 7.2V - 7.4V Charging voltage: 8.4V...
€17.50 *
Net price €14.71 VAT €2.79 *
Enerpower 2S2P Li-Ion 7.2V-7.4V with open ended cables
Enerpower 2S2P Li-Ion 7.2V-7.4V with open ended...
This Li-ion 2S2P battery with open ended cables has 7.2V-7.4V and is assembled with a protection circuit. This battery can be used universally, such as a spare battery for FUTABA transmitter. We assemble this battery in 3 variations:...
From €24.50 *
Net price €20.59 VAT €3.91 *
Enerpower 2S2P Li-Ion 7.2V-7.4V Futaba replacement with open ended cables
Enerpower 2S2P Li-Ion 7.2V-7.4V Futaba...
This Li-ion 2S2P battery with open ended cables has 7.2V-7.4V and is assembled with a protection circuit. This battery can be used universally, such as a spare battery for FUTABA transmitter. We assemble this battery in 3 variations:...
From €22.99 *
Net price €19.32 VAT €3.67 *
Viewed

Important Notice Regarding Manufacturing and Delivery Time

Dear customers,

we manufacture many of our products ourselves in our production center in Berlin, Germany. So that we can offer you a wide range of products and attractive prices at the same time, we must use our manufacturing resources economically.

For this reason, we only go into production for many of our products (mainly ENERpower batteries) when we have an order for them.

We need more time for production, especially for bicycle batteries, electric boat batteries and energy storage. The range of 10-15 working days should also take into account during times of public holidays, but also the increased seasonal demand.

Thank you for your understanding.

Your ENERprof team


Important Notice Regarding COVID-19 >>